Open Access Solar Power Plant
Zero-capex third-party solar via Rajasthan open access β savings from Day 1 on your electricity bill.
About Open Access Solar Power Plant
You sign a 15β25 year Power Purchase Agreement (PPA) at a solar tariff of βΉ4.20β5.00/unit β significantly lower than your current Rajasthan DISCOM grid tariff of βΉ8β9.50/unit β with zero upfront capital expenditure. Savings begin from Day 1.
FGPS Solar sources, designs, finances, constructs, and operates the remote solar plant at its own cost. You simply pay a per-unit tariff for the clean power that arrives at your meter each month. This model is ideal for high-consumption industries (>1 MW sanctioned load) in Rajasthan\’s textile belt (Bhilwara, Pali), cement and marble sector (Jodhpur, Udaipur), and IT/data centres in Jaipur.
From open access application to Day-1 savings β 4 steps
We manage the entire process end-to-end: engineering, procurement, installation, and commissioning.
1. Site Survey
Engineer visits, measures roof area, assesses shading, checks load, and reviews bills.
2. Design & Proposal
Detailed layout, shadow simulation, financial proposal with payback projections and EMI options.
3. Installation
Certified team installs panels, inverter, wiring, and net-metering hardware in 2β7 days.
4. Switch-On
DISCOM inspection, net-meter installation, system commissioning, and 25-year warranty handover.
Why Rajasthan industries choose open access solar via FGPS
Slash electricity bills
Cut your monthly electricity bill by 70β90% from day one β your roof becomes a lifelong income asset.
Cleaner energy footprint
Each kW of solar offsets ~1.5 tonnes of COβ per year β measurable impact your stakeholders can verify.
25-year warranty
Tier-1 panels with 25-year linear performance warranty plus 10-year inverter and product warranty.
Real-time monitoring
Track generation, savings, and COβ offset live from a smartphone app β anytime, anywhere.
Government subsidies
We handle PM Surya Ghar and state subsidy paperwork end-to-end so you get every rupee available.
End-to-end service
Survey, design, install, paperwork, monitoring, and 5-year free maintenance β one accountable partner.
Pick the right system size
1 MW
- PPA tariff βΉ4.50β5.00/unit vs grid βΉ8β9.50/unit
- Zero capex required
- Saves 30β40% on monthly energy cost
- PPA term 15β25 years
5 MW
- PPA tariff βΉ4.20β4.80/unit
- Save βΉ3β5L/month per MW contracted
- Wheeled via Rajasthan state grid (RVPNL)
- RERC open-access approved framework
20+ MW
- PPA tariff as low as βΉ3.80β4.50/unit
- 100% renewable energy certificates (RECs)
- Portfolio PPA across multiple Rajasthan sites
- Dedicated wheeling corridor on RVPNL grid
See this solution in the field
Frequently Asked Questions
Schedule a FREE consultation with us today!
Please fill the form and we will get in touch with you for the consultation
