Industrial Tin Shed Solar
Custom-engineered rooftop solar for tin and metal-sheet factory roofs in Rajasthan's industrial zones.
About Industrial Tin Shed Solar
FGPS Solar engineers custom L-foot mounting structures that distribute load evenly across corrugated GI, galvalume, and pre-coated metal sheets without compromising structural integrity or voiding roof warranties. All cable trays are weather-sealed and all penetrations are gland-plate sealed to prevent leaks.
At Rajasthan’s commercial industrial tariff of βΉ7.50β9.50 per unit (DISCOM slab), a 100 kW solar system generating roughly 14,000 kWh per month saves approximately βΉ1β1.3 lakh every month β from the very first switch-on. Commercial systems also qualify for 40% accelerated depreciation in Year 1 under Section 32 of the Income Tax Act, dramatically improving first-year returns.
From factory survey to zero electricity bill β 4 engineering steps
We manage the entire process end-to-end: engineering, procurement, installation, and commissioning.
1. Site Survey
Engineer visits, measures roof area, assesses shading, checks load, and reviews bills.
2. Design & Proposal
Detailed layout, shadow simulation, financial proposal with payback projections and EMI options.
3. Installation
Certified team installs panels, inverter, wiring, and net-metering hardware in 2β7 days.
4. Switch-On
DISCOM inspection, net-meter installation, system commissioning, and 25-year warranty handover.
Why Rajasthan industrial units choose FGPS for tin shed solar
Slash electricity bills
Cut your monthly electricity bill by 70β90% from day one β your roof becomes a lifelong income asset.
Cleaner energy footprint
Each kW of solar offsets ~1.5 tonnes of COβ per year β measurable impact your stakeholders can verify.
25-year warranty
Tier-1 panels with 25-year linear performance warranty plus 10-year inverter and product warranty.
Real-time monitoring
Track generation, savings, and COβ offset live from a smartphone app β anytime, anywhere.
Government subsidies
We handle PM Surya Ghar and state subsidy paperwork end-to-end so you get every rupee available.
End-to-end service
Survey, design, install, paperwork, monitoring, and 5-year free maintenance β one accountable partner.
Pick the right system size
50 kW
- Saves ~βΉ52,000β65,000/month
- ~240 panels on tin roof
- Load-tested L-foot mounting
- Payback in ~3 years
100 kW
- Saves ~βΉ1β1.3L/month
- ~480 panels + custom cable trays
- Weather-sealed installation, no leaks
- Payback in 3β3.5 years
250 kW
- Saves ~βΉ2.5β3L/month
- Structural load report included
- 40% depreciation saves βΉ25L+ in Year 1 tax
- Payback in 2.5β3 years
See this solution in the field
Frequently Asked Questions
Schedule a FREE consultation with us today!
Please fill the form and we will get in touch with you for the consultation
